Melfi installation

10/15/2015

THERMAL CENTRAL OF GREAT POWER IN POTENZA HINTERLAND

The thermal plant has 3 boilers for mixed use technology/heating:

On these boilers are installed natural gas ENERGY ultra-low NOX burners IBST:

In addition to the low environmental impact, the thermal power plant is equipped with an automation system and supervision of burners with SIEMENS S7300 PLC with high technology for BMS and BCS control and air combustion fan motors ABB INVERTER for ENERGY SAVING.

Back